chapter 8 project implementation plan and project costs 8 1 introduction the study road comprises the road stretch between erdene undurkhaan totaling 258 8 km in length within the study ...
Filetype PDF | Posted on 13 Sep 2022 | 2 years ago
The words contained in this file might help you see if this file matches what you are looking for:
...Chapter project implementation plan and costs introduction the study road comprises stretch between erdene undurkhaan totaling km in length within long section baganuur is being constructed by department of roads using government s own fund budget for this billion togrog construction period scheduled to be years from covers hereinafter referred as totals excluding above mentioned however since traffic demand forecast has been carried out cover entire made recognition work done on particularly economic analysis based estimated benefit accrued forecasted planning there are existing villages such tsenkhermandal sum jargaltkhaan murun along route also connecting at kherlen river east west divided into following six sections consideration i l dor excluded ii iii iv v vi location each shown figure time schedule prepared quantity works considering salient features area asphalt pavement limited months may september earthwork april october stockpiling aggregates pre cast concrete structures oth...