File: Construction Pdf 83559 | Concept Design Cost Estimate Option 3
Construction Cost Estimate Concept Design Cost Estimate Belmont Public Library Option 3 - New Construction Belmont, MA Prepared for: Johnson Roberts Associates, Inc. 15 Properzi Way, Somerville, MA 02143 January ...
Filetype PDF | Posted on 13 Sep 2022 | 2 years ago
The words contained in this file might help you see if this file matches what you are looking for:
...Construction cost estimate concept design belmont public library option new ma prepared for johnson roberts associates inc properzi way somerville january project details description basis of this has been at the request and is to provide a study demolition located concord ave in based upon measured quantities built up rates from drawings sketch model issued rlb on th december by where information was insufficient assumptions allowances were made wherever possible discussions with architect engineers it assumed that will be competitively bid four six general contractors awarded contractor all subcontractors required pay prevailing wage also expected filed sub bids are unit pricing costs estimating contingency included an allowance escalation not items specifically gross floor area approx sq ft excluded wiring equipment communications systems includes infrastructure only security book detection system assume owner storage racking or shelving interior feature signage removal re installat...